VA Industrieanlagenbau Linz Coil Coating Line
Starts: 19 January 2026 at 08:00 GMT
Ends: 25 March 2026 at 14:00 GMT
VA Industrieanlagenbau Linz Coil Coating Line in Mothballed condition available immediately. Since November 2014 no strip coating has been carried out. The plant was converted into a repair facility. Both furnaces, the RNV, the water coolers, the inline measuring systems and the film laminating unit were shut down. From this date onward the plant was operated in a “cold” condition. The plant was finally shut down in May 2025. NOTE: Vendor to approve closing bids prior to Apex final invoicing.
Share:
Showing 1 of 1 lots
- LOT 1
![site]()
VA Industrieanlagenbau Linz Coil Coating Line
Commissioned in July 1989. Since November 2014, no strip coating has been carried out. The plant was converted into a repair facility. This means that both furnaces, the RNV, the water coolers, the inline measuring systems, and the film laminating unit were shut down. From this date onward, the plant was operated in a “cold” condition. The plant was finally shut down in May 2025. Please see attachments for further information. Annual capacity appr. 250,000 t. Line speed: Entry section 150 m/min, Treatment section 120 m/min, Exit section 180 m/min. Strip dimensions: Width 600 – 1,600 mm, Thickness 0.4 – 1.50 mm (width of up to 1,600 mm) 1.51 – 2.00 mm (width upon request). Pre-treatment: Degreasing and chromate-free pre-treatment. Coaters:A maximum of 4 coatings is applied to the strip (2 layers on top side, 2 layers on bottom side). Curing ovens: For curing of the previously applied coating. Length of oven 40 m, non-contact length 60 m, oven temperature 300 – 500 °C. Film lamination and cooling stations: Application of the protective foil (120 μm) and cooling of the strip.
Essential Information
General Information
- Auction Dates
- Starts: 19 January 2026 at 08:00 GMTEnds: 25 March 2026 at 14:00 GMT
- Site Address
- LinzAustria
- Viewing Days
- By Appointment OnlyViewings strictly by appointment only – Please contact Apex to make an appointment.
Fees & Payment
- Currency
- EUR
- Buyers Premium
- 18% or as specified on individual items
- Payment
General payment information
- Payment is due immediately on receipt of invoice
- All payments must be made in the currency on the invoice issued.
- Accepted forms of payment are bank transfer. We do NOT accept payment by card, cash or cheque.
Goods
- Clearance days
- 07 April 2026 at 08:00 BST - 26 June 2026 at 15:00 BSTCollections strictly by appointment only.
- General Collection Information
Collection
- Buyers are fully responsible for removal of items plus all shipping and rigging charges.
- Items are only available to collect once the transfered funds have cleared, and a collection appointment has been booked.
- Buyers or third party movers must present an invoice to the on-site personnel when removing their items.
- Buyers must complete the removal of items within the clearance deadline. Normal removal hours are Monday to Friday, from 9am to 4pm (local time) unless otherwise stated.
- Contact and removal information will be emailed at the time invoices are issued.
- Sales Contacts
- Auction informationSue Sykes01273224466
Apex Auctions
69 Middle Street
Brighton
BN1 1Al info@apexauctions.com00441273224466
